IBM P5 520 Projector User Manual


 
68 IBM System p5 520 and 520Q Technical Overview and Introduction
Figure 2-20 Pull the server to the service position
3. Release the rack latches (C) on both the left and right sides, as shown in the Figure 2-20.
4. Review the following notes, and then slowly pull the system or expansion unit out from the
rack until the rails are fully extended and locked:
If the procedure you are performing requires you to unplug cables from the back of the
system or expansion unit, do so before you pull the unit out from the rack.
Ensure that the cables at the rear of the system or expansion unit do not catch or bind
as you pull the unit out from the rack.
When the rails are fully extended, the rail safety latches lock into place. This action
prevents the system or expansion unit from being pulled out too far.
The IBM Systems Hardware Information Center is available for more information or to view
available video-clips that describe several of the maintenance repair-action procedures.
2.15.4 Cable-management arm
The rack-mounted model is shipped with a cable-management arm to route all the cables
through the hooks along the cable arm and secure them with the straps provided. The
cable-management arm simplifies the cables management in the case of a service action that
requires you to pull out the rack-mounted system from the rack.
Caution: This unit weighs approximately 43 kg (95 lb.). Ensure that you can safely
support this weight when removing the server unit from the system rack.