MGE UPS Systems 700 Power Supply User Manual


 
2.6 Start-Up Sequence
WARNING: THERE ARE DANGEROUSLY HIGH VOLTAGES PRESENT WITHIN THE
ENCLOSURE OF THE POWER SUPPLY SYSTEM. CAUTION MUST BE TAKEN
WHEN WORKING WITH THE ENCLOSURE. IT IS RECOMMENDED THAT ALL
WORK BE PERFORMED BY QUALIFIED ELECTRICAL PERSONNEL ONLY.
NOTE: INITIAL START-UP SHOULD BE PERFORMED WITH NO-LOAD ON THE SYSTEM.
1. Re-install all panels that may have been removed during installation.
2. Make sure the input circuit breaker is in the off position.
3. Energize the primary building power.
4. Turn on the main AC input breaker.
5. Verify that the output voltage is within the specified range.
6. Verify output phase rotation is correct.
7. Turn the system off.
8. Connect the loads one at a time and repeat Step 5.
Installation and Operation
Power-Sure™ 700 —
Three Phase Power Conditioners
2 — 8