2
Precautions
2-8 CF2002/CF3102
Space requirements
To ensure easy copier operation, supply replacement, and maintenance,
adhere to the recommended space requirements detailed below.
✎
Note
Be sure to allow a clearance of 100 mm (4 in.) or more at the back of
the copier for the ventilation duct.
Unit: mm (inch)
1839 (72-1/2)
285
(11-1/4)
283
(11-1/4)
1271 (50)
1521 (60)
1432 (56-1/2)
792
100
540
358
(14)
1163
(45-3/4)
(21-1/4) (31-1/4)
(4)
CF2002.book Page 8 Friday, June 13, 2003 9:29 AM