NEC N8103-89 Computer Drive User Manual


 
76
Notice
Note the following for the rebuild:
The HDD to be used for rebuild should have the same capacity, number
of revolutions, and standard as the defected HDD.
During rebuild, the processing rate is decreased due to much load.
During rebuild, do not shut down or reboot the server. If the server is
shut down by an unforeseen accident such as power interruption, turn on
the power again as soon as possible. The rebuild is automatically
restarted.
For the hot-swap rebuild, an additional HDD cage is required.
The interval from the removal of the defected HDD to the installation of a
substitute HDD should be 90 sec or longer.
If the hot-swap rebuild does not operate, perform the manual rebuild.