Perle Systems RPS830 Switch User Manual


 
5-15
Confi guration
5.3.3.2. The Boot / Sequence Delay Period.
The Boot / Sequence Delay value will be applied differently for Reboot
operations as opposed to simple On/Off operations as described below:
1. Reboot Cycles:
a) Single Plug: The Boot/Seq. Delay determines how long the plug
will remain Off before it is switched back On again.
b) Several Plugs: The Boot/Seq. Delay determines how long the plug
will remain in the "Off" condition, and also how long the RPS will
pause before proceeding to the next plug specified.
2. On/Off Switching: The Boot/Seq. Delay determines how long the RPS
will pause before proceeding to the next plug specified by the
ON command.
Examples: Assume that the Boot / Sequence Delays for each plug have been
set as follows: Plug 1 = 1 Second, Plug 2 = 2 Seconds, Plug 3 = 5 Seconds,
Plug 4 = 1 Minute, Plug 5 = 1 Second
If an "On" command is applied to the first five plugs, the RPS will respond
as follows:
1. Turn On Plug 1, Wait 1 Second.
2. Turn On Plug 2, Wait 2 Seconds
3. Turn On Plug 3, Wait 5 Seconds
4. Turn On Plug 4, Wait 1 Minute
5. Turn On Plug 5
If a "Reboot" Command is applied to Plug 3, the RPS will respond as follows:
1. Turn Off Plug 3, Wait 5 Seconds, Turn On Plug 3.
If a Reboot Command is applied to the first five plugs, the RPS will respond
as follows:
1. Turn Off the first five plugs (short delay between plugs.)
2. Wait 1 Second, Turn On Plug 1, Wait 1 Second.
3. Wait 2 Seconds, Turn On Plug 2, Wait 2 Seconds.
4. Wait 5 Seconds, Turn On Plug 3, Wait 5 Seconds.
5. Wait 1 Minute, Turn on Plug 4, Wait 1 Minute.
6. Wait 1 Second, Turn on Plug 5.