7. Remove the internal saddle.
See
FIGURE 1-2.
8. Lift off the server bag.
9. Make a visual check to ensure that the chassis is undamaged.
10. Move the server to the operating location using a computer lifting device.
Note Power cords for the Netra 1290 server are supplied in a separate country kit.
Note The Solaris software and the LOM firmware are preinstalled or
preconfigured on the server.
Installing Slide Rails
Caution – The cabinet stabilizers (if applicable) must be extended whenever a Netra
1290 server is pulled out of the cabinet.
Caution The Netra 1290 server, with mounting cradle, weighs approximately 286
lb (130 kg). Two people using a computer equipment lift are required to move the
server safely into the cabinet.
Caution Pull only one Netra 1290 server out of the cabinet at a time to prevent
unbalancing the cabinet.
Servers that are to be mounted in a cabinet use a slide rail mounting kit. This kit
includes the following:
Two lock spacers
Two lock nuts
Four slide rails, two inner and two outer
8 mm wrench
Note If you received your server preinstalled in a cabinet you may proceed
directly to “Installing the Cable Management Arm” on page 24.