Sun Microsystems 1290 Server User Manual


 
v
Figures
FIGURE 1-1 Opening the Shipping Carton 2
FIGURE 1-2 Removing the Carton Pieces 3
FIGURE 1-3 Slide Rail Assembly (Standard Configuration) 5
FIGURE 1-4 Spring Clips and Cutouts 7
FIGURE 1-5 Slide Rail Assembly–Modified for 2-Post Installation 8
FIGURE 1-6 Installing the Slide Rails in a Sun Fire Cabinet 10
FIGURE 1-7 Installing the Rails in a Sun Rack 900 Cabinet or 19-Inch Four-Post Cabinet 12
FIGURE 1-8 Releasing the Door Hinge Mechanism 16
FIGURE 1-9 Removing the Shipping Cradle Bolts 17
FIGURE 1-10 Inserting the Lifting Device Into the Shipping Cradle 18
FIGURE 1-11 Aligning the Rails 19
FIGURE 1-12 Removing the Shipping Cradle 20
FIGURE 1-13 Pushing the Server Into the System Cabinet 21
FIGURE 1-14 Tightening the Securing Screws 21
FIGURE 1-15 Inserting and Tightening the Spacers 23
FIGURE 1-16 Inserting and Tightening the Lock Nut 23
FIGURE 1-17 CMA Bracket Mounting Holes 24
FIGURE 1-18 CMA–Lite Cable Management Arm 25
FIGURE 1-19 Upper and Lower CMA Arms, and Left-Hand and Right-Hand T-Brackets 26
FIGURE 1-20 Upper and Lower Pivot Bracket Mounting Holes 27