Sun Microsystems 1290 Server User Manual


 
14 Netra 1290 Server Installation Guide May 2006
b. Discard the adjustable bracket.
2. Adjust the length of each slide rail assembly.
a. Loosen the four nuts that secure the rear bracket.
b. Reposition the rear bracket to the appropriate markings shown on the slide rail
assembly and secure the rear bracket.
3. Secure the rear bracket with two No. 10-32 UNF screws (
FIGURE 1-7).
To install the server in the lowest position, insert the rackmount securing screws
no lower than 18.5 inches and 22.5 inches (47.0 cm and 57.2 cm) respectively.
Note – Mounting the bracket no lower than 18.5 inches and 22.5 inches allows for 10
inches of space beneath the server in order to service the backplane.
To install the server in the topmost position, insert the rackmount securing screws
no higher than 39.5 inches and 43.5 inches (100.0 cm and 110.0 cm) respectively.
4. Secure the front bracket with two No. 10-32 UNF screws (
FIGURE 1-7).
5. Repeat Step 1 through Step 4 for the second slide rail assembly.
Installing the Slide Rail Assemblies in a 19-Inch 2-
Post Rack
Note The slide rail assemblies must be prepared. See “To Prepare the Rails for 2-
Post Installations” on page 8.
Note The slide rail assemblies are reversible. They can be used on either side of
the cabinet.
Caution Ensure that the rack is anchored to the floor, ceiling, or adjacent frames.
It is the installer’s responsibility to ensure that the rack has sufficient structural
strength and stability to handle any required installations.