· Allocation of the cable terminal block:
· Use a small screwdriver. Press the
orange terminal. The terminal will open.
· Insert the (at least 11 mm bare) cable
into the respective terminal hole.
· Release the pressure from the screw-
driver. The cable is now attached to
the connection.
· Make sure the cable is connected tightly.
121
Pin allocation
sensor connector
Pin 1
Pin 2
Pin 3
Pin 4
Sensor pin name
Plus signal temperature
Plus signal insolation intensity
Plus connection supply +5 V
Earth reference
Solar inverter pin name
S-Temp
P-Solar
V+
V-
BP13370_NT_10000_englisch 23.11.2005 17:40 Uhr Seite 37