Start-up (without DC main switch)
1. Connect the Tyco Solarlok connectors
to your Solar Inverter.
2. Start-up the AC side.
Shut-down (with DC main switch)
1. Disconnect the PV generator side by
opening the DC main switch.
2. Open the grid connection by isolating
(switching off) the corresponding grid
fuse.
3. After a waiting time of at least five
minutes, the Solar Inverter is deener
gised.
Shut-down (without DC main switch)
1. Interrupt the grid connection by isola-
ting (switching off) the corresponding
grid fuse. A fault will then be recorded
in the fault memory of the Solar
Inverter.
2. Pull the Tyco Solarlok connector out of
your Solar Inverter.
Never disconnect the PV generator by
pulling out the Tyco Solarlok connectors
under load! Otherwise a powerful electric
arc might damage the connectors.
The damaged connectors then have to
be replaced!
2.5 Dismantling the Solar Inverter
To dismantle the Solar Inverter, loosen the
hexagon socket screws, and move the
cover up. Make sure the Solar Inverter is
de-energised; then remove the supply
lines. The Solar Inverter may then be lifted
out of the assembly frame.
!