Toshiba G7 Network Card User Manual


 
G7 ASD Multi-Protocol Communication Option and PG Feedback Option Manual
2
2. Safety Precautions
Rotating shafts and electrical equipment can be hazardous. Installation, operation, and
maintenance of the ASD and option shall be performed by Qualified Personnel only.
Qualified Personnel shall be:
Familiar with the construction and function of the ASD and option, the equipment
being driven, and the hazards involved.
Trained and authorized to safely clear faults, ground and tag circuits, energize
and de-energize circuits in accordance with established safety practices.
Trained in the proper care and use of protective equipment in accordance with
established safety practices.
Installation of ASD systems and associated options should conform to the 1999
National Electrical Code Article 110 (NEC) (Requirements For Electrical
Installations), all regulations of the Occupational Safety and Health
Administration, and any other applicable national, regional, or industry codes and
standards.
DO NOT install, operate, perform maintenance, or dispose of this equipment until
you have read and understood all of the following product warnings and user
directions. Failure to do so may result in equipment damage, operator injury, or death.
2.1 Installation Precautions
Use lockout/tagout procedures on the branch circuit disconnect before installing
the option into the ASD.
Avoid installation in areas where vibration, heat, humidity, dust, metal particles,
or high levels of electrical noise (EMI) are present.
Do not install the ASD or option where it may be exposed to flammable
chemicals or gasses, water, solvents, or other fluids.
Where applicable, always ground the option appropriately to prevent electrical
shock to personnel and to help reduce electrical noise. The ASD’s input, output,
and control power cables are to be run separately from the option’s associated
cables.
Note: Conduit is not an acceptable ground.
Turn the power on only after attaching the front cover.
Follow all warnings and precautions and do not exceed equipment ratings.
The ASD maintains a residual charge for a while after turning the ASD off. Wait
at least ten minutes before servicing the ASD after turning the ASD power off.
Ensure that the Charge LED is off prior to beginning installation.
For further drive-specific precaution, safety and installation information, please
refer to the G7 Adjustable Speed Drive Operation Manual supplied with your
drive.