Western Telematic MPC-8H-1 Network Card User Manual


 
Apx-9
Appendices
2. Attaching the "L" Brackets to the Equipment Rack: Determine which direction
the MPC unit will face in the rack, then line the "U" slots in the "L" Bracket up with
two holes in the equipment rack mounting strip. Make certain that the unit is
level, and then use two screws to secure each "L" bracket to the rack as shown in
Figure E.2.
1 2 3
4
5
Figure E.1: Mounting Holes; MPC-20V Back Panel
MPC-20V Unit
Equipment Rack
“L” Bracket
Retaining Screws
Figure E.2: Attaching the "L" Brackets to the Equipment Rack (MPC-20V Shown)