Asus GigaX Network Card User Manual


 
GigaX Series L3 Managed Switch User Guide
79
5.1 Power On Self Test
POST is executing during the system booting time. It tests system memory,
LED and hardware chips on the switchboard. It displays system information as
the result of system test and initialization. You can ignore the information until
the prompt, “(ASUS)%”, appears (see Figure 49).
Figure 49. CLI interface