AT&T 2.1.1 Time Clock User Manual


 
About This Manual
This guide is divided into the following chapters:
Chapter 1: Overview and Testing
describes the AUDIX Voice Power
hardware and software, and presents procedures for testing the
communication between AUDIX Voice Power and the telephone system.
Chapter 2:
AUDIX
Voice Power Initial Implementation
describes the
initial implementation procedures for AUDIX Voice Power.
Chapter 3: System
75
and DEFINITY G1 Initial Implementation
discusses the features and administration of the System 75 and
DEFINITY G1 Communications Systems as they relate to AUDIX Voice
Power. It includes instructions for programming the telephone system to
operate properly with AUDIX Voice Power.
Intended Audience
This guide is for the System Manager, Switch Administrator, and AT&T Account
Team personnel. It provides three types of information:
Testing procedures for establishing the hardware linkage between the
AUDIX Voice Power system and the telephone system
Planning information about the switch features and the interaction between
the switch and AUDIX Voice Power
Instructions for initial administration of both AUDIX Voice Power and the
System 75 or DEFINITY G1 Communications System so that they will work
together
An emphasis is placed on planning before implementing. Basic information is
offered about connections to, and administration of, the switch as it is affected by
the AUDIX Voice Power system. The switch requires detailed installation and
administrative functions in addition to those described here. This guide is not
intended to replace the documents that accompany the switch.
Assistance
If you have questions or problems with AUDIX Voice Power, please try to resolve
them by using this guide and the other AUDIX Voice Power documents. If you are
still unable to resolve the problem, contact your AT&T Account Representative or
AT&T Authorized Dealer for assistance.
ii