Emerson IM-105-4000 Computer Monitor User Manual


 
Instruction Manual
IM-105-4000, Original Issue
August 2005
OPM 4000
http://www.raihome.com
Section 3 Startup and Calibration
Before Startup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-1
Stack Exit Correlation Computation . . . . . . . . . . . . . . . . . page 3-2
Startup Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-2
Verifying Instrument Operation and Configuration . . . . . page 3-2
Edit Keys . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-2
Factory OPLR Display . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-3
Quick Menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-3
Zero/Span Calibration Check . . . . . . . . . . . . . . . . . . . . . . . page 3-4
BEFORE STARTUP
You must complete the following before startup is attempted.
1. Measure and record flange-to-flange distance to verify it is the same as
the final check out sheet.
2. If you are using a recorder, DAS, etc., DO NOT CONNECT THEM
NOW. Outputs and inputs from other sources should be left off until
system has been completely checked according to the following
instructions. After system operation has been verified, connect and test
external connections.
3. Read the instructions first to familiarize yourself with the instrument
before attempting startup.
4. The air purge and weather cover system, transceiver, retro reflector,
and service module must be installed and power applied.
5. Control unit must be installed and wired to the service module and
customers equipment as applicable.
6. All wiring and mechanical installations must be complete per drawings
provided in this manual. All wiring must be checked and power applied
to both the control unit and the stack maintenance module.
7. Beam alignment procedure has been completed.