RX330 S1 Operating manual 35
Hardware installation Installing/removing the server in/from the rac
k
4.2 Installing/removing the server in/from the
rack
V CAUTION!
● Follow the safety instructions in chapter “Important infor-
mation” on page 21 and section “Notes on installing in the rack”
on page 30.
● At least two people are needed to position the server into/out of
the rack.
● The rack can tip over when more than one unit is removed.
● The server may not occupy the top height unit of the rack (38 HU/42
HU PRIMECENTER Rack and/or DataCenter Rack), as otherwise
boards or fans cannot be replaced even with the plug-in module fully
extended.
Rack requirements
The rack systems from Fujitsu Siemens Computers (PRIMECENTER Rack and
DataCenter Rack) support installation of PRIMERGY servers. Installation in
most current rack systems from other manufacturers (3rd party racks) is also
supported.
To accommodate the ventilation concept and ensure proper ventilation, any
unused areas in the rack must be sealed using dummy covers.
The power is supplied via the multiple socket outlets fitted in the rack.