Fujitsu RX330 Server User Manual


 
RX330 S1 Operating manual 37
Hardware installation Installing/removing the server in/from the rac
k
3rd party rack
Certain general conditions must be met:
Installation dimensions (see the dimensions shown in figure 2 on page 38):
You must ensure that the safety mechanisms on the server, e.g. stoppers or
retaining systems, are functioning correctly.
The shape of the rack support uprights must ensure that the rails can be
bolted to the front.
Telescopic rails screwed to the front
The rails have a linear alignment feature to ensure that they can be adjusted
to different rack depths.
No support of the cable management (delivered with the mounting kit).
Climatic conditions.
An unobstructed air intake in the rack front and air discharge in the rear
cover of the rack are essential for ventilation of the installed server.
In principle the ventilation concept plans that the necessary cooling is
reached by the horizontal self-ventilation of the installed devices (air flow
from the front to the rear).
1 Front of rack
2 Rear of rack
A Rack depth (comparison PRIMECENTER Rack 940/1000 mm)
B Rack width (comparison PRIMECENTER Rack 700 mm)
C Clearance for 19” installation level
C1 Front 19” installation level
C2 Rear 19” installation level
D Cable routing area (cable area depth) and ventilation
E Space for front panel and ventilation
F Space for right and left support systems
P PRIMERGY rack installation depth
a1 Front left support upright
a2 Front right support upright
b1 Rear left support upright
b2 Rear right support upright