IBM 9117-MMB Power Supply User Manual


 
1. Press Enter.
2. Select the Task Selection option.
Note: If the terminal type is not defined, you are prompted to
define it before you can proceed.
3. Select the Log Repair option.
4. Select the resource associated with the repair action. If the repair
action was reseating a cable or adapter, select the resource
associated with that repair action. If the resource associated with
your repair action is not displayed on the Resource List, select
sysplanar0.
5. Click Commit after you have made your selection.
37. Exit from diagnostics in this partition and return to the AIX prompt.
38. Have all the partitions in the list of Axx partitions you began recording in step 14 on page 82 been
processed?
v Yes: Continue with the next step.
v No: Go to step 34 on page 84 to process the next partition in the list you recorded in step 14 on page 82.
39. If the system attention LED is still on, turn off the LED as described in “Activating and deactivating
LEDs” on page 93. This completes the repair. Return the system to the customer.
Note: If during the processing of the list of open service action events, some service action events
remained open, further service actions might be required to complete the repair.
Closing a service call using AIX or Linux
If the server is not connected to an management console and not using Integrated Virtualization Manager
(IVM), perform these procedures to close problem numbers, clear hardware messages, and prepare the
server to return to the customer.
Follow this checklist before performing the procedures:
v Return the server to the state that the customer normally uses, such as IPL type, IPL mode, and the
way the system is configured or partitioned.
Attention: Before returning the system to the customer, remove the system from service mode. If the
system is left in service mode, it automatically places a call for service every two hours.
v While you were performing the problem analysis on the original serviceable event, other
serviceable-event numbers might have been opened. Close all serviceable events that were opened as a
result of your service activity.
v Ensure that server verification has been performed and that no problems require additional service
actions.
v If the repair was done using the IVM online repair procedures, ensure that the original serviceable
event is now closed.
1. Did you use an AIX diagnostics service aid hot-swap operation to change the FRU?
v Yes: Go to step 4 on page 86
v No: Continue with the next step.
Power supplies 85