IBM ARTIC960RxD Network Card User Manual


 
Reinstalling the Quad T1/E1 DTA
The following instructions assume that you have the base adapter out of the system
unit and are ready to install the mezzanine card.
Before You Begin
Verify that the jumper on the base adapter is set properly (see page 1-3).
1. Align the connector on the mezzanine card with the PMC connector on the base
adapter.
Attention:
When the base adapter and the mezzanine card are properly aligned, the top of
the voltage keying pin on the base adapter fits into the voltage key opening on
the mezzanine card.
2. Firmly press the mezzanine card and the base adapter connectors together.
3. Install the four mounting screws; then tighten the screws.
4. Follow the procedure “Jumper Installation Information” on page 1-3.
3-2 Installation and User's Guide