Juniper Networks ERX-700 Network Router User Manual


 
CHAPTER 6
Powering Up the System
6-2
Powering Up
This procedure assumes that the system is already connected to a DC
power source. See Chapter 4, Cabling the ERX System.
For specifications on the electrical requirements for the system, see
Appendix A, System Specifications. For details on the power consumed
by the different ERX modules, see Appendix B, Module Specifications.
Branch Circuit Caution: Evaluate the overall loading of the branch circuit before
you install any equipment into a rack.
To power up the system:
1 Turn on the power switches located on the power input module in
the rear of the system. See Figure 6-1.
2 Monitor the LEDs on the front of the SRP modules to verify that the
system is booting properly. See Table 8-2 in Chapter 8,
Troubleshooting.
When the prompt appears on the system console, the system is in
User Exec mode:
host1>
3 Enter the enable command to access the Privileged Exec mode:
host1>enable
host1#
In Privileged Exec mode you can begin to configure the system. See
the ERX System Basics Configuration Guide, Chapter 2, Command
Line Interface for more information.
Connect DC power (–48 VDC) to the power input lugs on the
power input module.
Chapter 4, Cabling the
ERX System
Connect a management console to the system. Chapter 5, Accessing
the ERX System
(Optional) Connect the 10/100Base-T port to the network. Chapter 5, Accessing
the ERX System
Table 6-1 Installation tasks (continued)
Installation Task Reference