TTD-98055N page 11 of 44
5.0 Hardware Installation and Wiring
5.1 Mounting the Centurion Controller
The Centurion can be mounted vertically or horizontally on a standard DIN rail. Three clamp type feet along the bottom of
the controller attach to the DIN rail, however, rail stops are recommended to prevent sliding.
5.2 Mounting the Centurion C3-3 Display
The Centurion C3-3 Display can be mounted in the same hole cutout of other Murphy display modules. Four screws
attached the display bezel to the mounting surface.
5.3 Power Supply Wiring
Power
Centurion C3-1 I/O Module
Requirements: (10 to 32) VDC: 30W (Max)
There are two screw terminal connectors for power hookup at
terminals 62 and 63, labeled B+ and B- respectively.
Centurion C3-2 Optional Expansion Module
Requirements: (10 to 32) VDC
There are three screw terminal connectors for power hookup
at terminals 134 to 136, labeled B+, B- and B- respectively.
6-1/2 in. (165 mm)
6-1/2 in.
(165 mm)
5-1/4 in.
(134 mm)
2-1/8 in. (54 mm)
5.50 in.
(140 mm)
6.0 in. (152 mm)
3 in. (76 mm)
0.156 in. (4 mm) dia. 4 places
13-1/8 in. (333 mm)
4-7/8 in.
(125 mm)
2-1/2 in.
(64 mm)
DIN Type
Mounting Rail
C3-1 Mounting
Bracket
To Panel
C3-1
MOUNTING
BRACKET DETAIL
Power Hook Up
C3-2
Power Hook Up
C3-1