Nortel Networks 703t Network Card User Manual


 
Preinstallation requirements Standard 1.04
44 CallPilot
The following diagram shows how to: 1) align the tabs, 2) engage the cover,
and 3) tighten the thumbscrews.
What’s next?
If you want to install the chassis feet on the bottom of the server, continue
with “Installing the chassis feet” on page 45. Otherwise, continue with the
hardware installation. For more information, see “Installation checklist” on
page 34.
G101762
Top and
bottom tabs
on cover
Top and
bottom slots
in chassis
1
2
3