21
2. System
2-2. Connections
Connections when implementing gen-lock
(frame synchronizer OFF)
POWER
1
REF
GPI
SLOT2
2
SLOT
4
2
34 SLOT1
1
SLOT2 8
~IN
SDI INPUTS
TALLY
6
6
INPUTS
SIGNAL
SDI OUTPUTS
GND
INOUT
3
INOUT
2
INOUT
1
INOUT
OUTPUTS
1
5 7
SLOT
OFF
2
SLOT1 5
SLOTSLOT
PGM
RS-422LAN
ON
Power cord
(AC 220 V to 240 V, 50/60 Hz)
VTR
HD SDI
HD SDI monitor
Multi-Format Live Switcher
AV-HS400AE
HD SDI
HD camera
HD SDI
HD camera
HD SDI
HD camera
HD SDI
Sync Generator
HD SDI
HD SDI monitor
HD SDI
HD SDI monitor
When the unit is to be installed and when the connections are to be performed, be absolutely
sure to ask your dealer to be responsible for carrying out the work that needs to be done.
Use a 3-point power outlet as the power source in order to earth the unit securely.