Q-Logic 8C Switch User Manual


 
4 Installation
Powering Down a Switch
59042-01 A 4-17
6. Close the FTP session.
ftp>quit
7. Establish communications with the switch using the CLI. Enter one of the
following on the command line:
telnet xxx.xxx.xxx.xxx
or
telnet switchname
where xxx.xxx.xxx.xxx is the switch IP address, and switchname is the
switch name associated with the IP address.
8. A Telnet window opens prompting you for a login. Enter an account name
and password. The default account name and password are (admin,
password).
9. Open an Admin session to acquire the necessary authority.
cli $>admin start
10. Display the list of firmware image files on the switch to confirm that the file
was loaded. Refer to the Image Command on page B-13 for more
information.
cli (admin) $>image list
11. Unpack the firmware image file to install the new firmware in flash memory.
cli (admin) $>image unpack filename
12. Reset the switch to activate the new firmware. This will close the Telnet
session by default.
cli (admin) $>reset
4.4
Powering Down a Switch
Simply unplugging the switch from the power source does not allow the switch to
complete executing tasks and could lead to flash memory corruption. For this
reason, open a Telnet session and use the Shutdown command to initiate an
orderly shut down, then power down the switch. Refer to the Shutdown
Command on page B-60.