The Validator-NT main unit is powered on by pressing the red power
button. When powering on, the unit will display a series of start up
screens until the Start screen is reached, which contains the main menu.
At the top of every screen the following information appears - The name
of the screen being displayed “Start, Auto Test” etc., the current job
name, the battery condition and the date/time from the internal clock.
The Validator-NT always has a le open, which is the current le name
that appears at the top of the screen, so that data can be saved in
the event of auto-power down. The last job opened will remain as the
current job until changed even through on and off cycles.
The Start screen has ve buttons: Auto Test, Manual Tests, Network
Tests, Job Manager, Setup and Properties. You can navigate between
these buttons with the arrow keys that move from left to right on each
row.
Auto Test
Selecting this button takes you to a menu of ve functions used to work
with existing jobs or create new jobs and test cables. Test Results are
automatically saved and can be downloaded to Plan-Um to document
and archive the job.
Cable Test Schedule: Tests cables from a predened job le or dene-
as-you-go Cable Schedule using Pass/Fail criteria.
Site Information and Contractor Information: View, edit or create this
job information.
Custom Cable Denitions: View existing cable denitions and create
or edit custom cables.
Job Utilities: File utilities used to create or manipulate job les.
Manual Tests
Select this button to test data, phone, or 2 wire cables without dening
the job, cable name or type. The specied test is run and the raw results
displayed without pass or fail criteria being applied. Manual tests cannot
be saved as Auto Tests can.
Validator