4. How Auto Test Works
Creating the Cable Test Schedule in Plan-Um, uploading it to the
Validator, and running Auto Test is the easiest and most efcient way
to verify cables. See the Uploading/Downloading Jobs section of this
manual (or the Plan-Um Software Instructions) for detailed instructions
on how to upload and download job information and test results between
Plan-Um and the Validator.
When you have uploaded a job from Plan-Um to the Validator-NT main
unit, the job will appear in the list on the Job Manager screen. To run an
existing job, you must rst open it from the Job Manager before using it
with Auto Test.
When you open a job, the Auto Test screen appears. This screen gives
you ve options: Cable Test Schedule, Site Information, Contractor
Information, Custom Cable Denitions and Job Utilities. See Figure
4.1 for a Flowchart of the Auto Test process.