American Power Conversion PD60H5HK1 Power Supply User Manual


 
PDU Display Interface
6 60kW InfraStruXure PDU—Operation and Configuration
Top-level status screens
After displaying a brief start-up screen after system start-up, the display interface scrolls
automatically and continuously through four screens of basic status information. Press the Up and
Down arrow keys to interrupt the automatic scrolling to view a specific status screen.
Top-level menu screen
On any top-level status screen, press the ENTER key to open the top-level menu screen.
Navigating through screens
To open any screen, press the Up and Down arrow keys until the selector arrow (

rests next to your
desired selection. Press the
ENTER key to view the selected screen.
When configuring settings, press the Up and Down arrow keys
until the selector arrow (

rests next to the setting you want to
change, and press the
ENTER key. If the setting is a list of choices,
an input arrow (

will appear next to the setting. Press the Up and
Down arrow keys until your desired change is listed. Press the
ENTER key to select the setting.
Volts In
L1-2: 000
L2-3: 000
L3-1: 000
L1: 000
L2: 000
L3: 000
Volts Out
Total Output Loading
kW:
kVA:
Freq:
PF:
%LD:
000
00.0
000
000
000
Load Current
L1: 000
L2: 000
L3: 000
Neut:
000
No Active Alarms
System Date/Time:
Jun-24 2003 07:58
Note
If the display interface is inactive for the time specified as the Time-out setting, the
interface reverts to the initial basic monitoring screens.
For descriptions of the top-level menu choices, see the individual sections starting on
page 8.
Load-Meter
Volt-Meter
Contacts
Breakers
Alarms
Panel
Config
Help
Load-Meter
Volt-Meter
Contacts
Breakers
Alarms
Panel
Config
Help
Contacts In: 02of04
Name: User Switch #2
Normal: Open
Status: Open
Contacts In: 02of04
Name: User Switch #2
Normal: Open
Status: Open