APC 10-40 KVA 380/400/415 V Power Supply User Manual


 
Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation6
Remove the cable landing cover and bottom plates
To access the cable landing area in the UPS and the XR Battery Enclosure(s), follow this procedure:
1. Loosen the six M4 screws from the cable landing cover plate on the UPS and the XR Battery
Enclosure(s) and then remove the plates.
2. Remove the screws from the bottom plate on the UPS and the XR Battery Enclosure(s) and then
remove the plates.
3. Punch holes in the bottom of the conduit boxes (optional for 380/400/415 V) to fit the size of the
conduit pipes.
Note: The conduit box is not included in European and Japanese UPS units, but can be
purchased (SUVTOPT001: 10-20 kVA UPS, SUVTOPT002: 10-40 kVA UPS plus XR Battery
Enclosure).
4. Attach the bottom part of the conduit boxes to the back of the UPS and the back of the XR
Battery Enclosure, respectively with four screws each (if applicable). The bottom part of the
conduit box is secured to the enclosure with four screws.
N
+
Bottom plate
Bottom plate
Conduit box
(bottom part)
Conduit
box (upper
part)
Cable
landing
cover plate
Conduit box
(bottom part)
Conduit
Box
(upper
part)
Cable
landing
cover
plate