APC 10-40 KVA 380/400/415 V Power Supply User Manual


 
Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation24
Post-Installation Checklist
Use the following checklist to verify that the XR Battery Enclosure has been installed correctly:
Note: If a problem occurs, call Customer Support (see the back cover).
See also the Operation Manual located in the documentation storage area behind the front
panel of the UPS and XR Battery Enclosure(s).
Ensure that all busbars/cables between the XR Battery Enclosure(s) and
the UPS are correctly installed.
Ensure that the DC breaker (if available) in the Battery Enclosure is in
the OFF or STAND-BY position.
Install the enclosure plates.