APC 10-40 KVA 380/400/415 V Power Supply User Manual


 
Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation2
Prepare for Floor-Anchoring (optional)
Note: If floor anchoring and battery securing is required, read this section. If not, see “Prepare
for Cables” on page 5.
Note: Allow for enough working space behind the enclosure for electrical work to be carried
out (e.g. if you want to install a conduit box or if you want to connect an XR Battery Enclosure
at a later stage). Minimum rear clearance is 100 mm (3.93 in) and must comply with applicable
national and local codes. 600 mm (23.6 in) is recommended.
Note: The L-shaped floor anchoring brackets that secured the enclosure to the pallet during
shipment may be used for a stand-alone UPS enclosure to enhance stability. See this chapter for
hole positions and see also “Level the Enclosures (L-shaped Floor Anchoring Brackets) and
Install Batteries” on page 20. The L-shaped floor anchoring brackets are not necessary when
baying enclosures together. Instead, the three U-shaped floor anchoring brackets from the
baying kit are used.
Note: Hole positions are only intended as a guide.
System arrangements
APC recommends the following arrangements of UPS units and XR Battery Enclosures (XR) in parallel.
Examples with two parallel systems using baying kits.
XRXR XR XRUPS XRXR XR XRUPS XRXR XR XRUPS XRXR XR XRUPS
XR XR XRXR XRXR XR XRUPSUPS