Cisco Systems IAD2430 Computer Hardware User Manual


 
3-4
Cisco IAD2430 Series Integrated Access Devices Hardware Installation Guide
OL-4234-06
Chapter 3 Installing Cisco IAD2430 Series IADs
Mounting Tools and Equipment
Installation Checklist
The Installation Checklist (see Figure 3-1) lists the tasks for installing a Cisco IAD. Print a copy of this
checklist and mark the entries as you complete each task. For each Cisco IAD, include a copy of the
Installation Checklist in your Site Log.
Figure 3-1 Installation Checklist
Installation Checklist for site ______________________________________________
Cisco IAD name/serial number _____________________________________________
Mounting Tools and Equipment
Obtain the following tools and parts needed for installing a Cisco IAD2430 series IAD:
Standard flat-blade screwdriver as required for attaching brackets to rack or wall.
Phillips screwdriver for attaching brackets to the IAD.
Mounting brackets and screws for 24-inch rack, if required.
Four telco machine screws for installing the chassis in a rack (use the screw size required by the
rack).
Screws and anchors for wall mounting, if required.
Task Verified by Date
Background information placed in Site Log
Environmental specifications verified
Site power voltages verified
Installation site prepower check completed
Required tools available
Additional equipment available
Cisco IAD received
Quick start guide received
Regulatory compliance and safety information received
Information packet, warranty card, and Cisco.com card received
Software version verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Modem attached to console port (for remote configuration)
Signal distance limits verified
Startup sequence steps completed
Initial operation verified