Dell B-FCX Switch User Manual


 
PowerConnect B-FCX Switch Hardware Installation Guide 15
53-1002267-01
Chapter
2
Installing the PowerConnect B-FCX Switch
CAUTION
The procedures in this manual are intended for qualified service personnel.
CAUTION
Before beginning the installation, see the precautions in “Power precautions” on page 17.
Unpacking the device
PowerConnect B-FCX devices ship with all of the items listed below. Verify the contents of your
shipping container. If any items are missing, please contact the place of purchase.
Package contents
The following items are included in your shipping carton:
PowerConnect B-FCX device
115V AC PDU power cords(C13- C14) (for AC sourced devices)
PowerConnect B-FCXs devices ship with a .5M CX-4 stacking cable
Rack mount kit
Document Kit
Rubber feet Kt
Retainer nuts and screws
Warranty card
A straight-through EIA or TIA DB-9 serial cable (F/F). If you prefer to build your own cable, see
the pinout information in “Attaching a PC or terminal” on page 25.
General requirements
To manage the system, you need a management station, such as a PC running a terminal
emulation application. Connect the management station to the Console serial port on the switch.
Use the serial connection to perform basic configuration tasks, including assigning an IP address
and network mask to the system. This information is required to manage the system using the Web
management interface or Brocade Network Advisor or using the CLI through Telnet.