Emerson ATCA-7150 Power Supply User Manual


 
Chapter: 3
ATCA-7150 and RTM-ATCA-7150 Getting Started (6806800G42B)
69
Hardware Installation of ATCA-7150
3.1 Overview
This chapter describes:
z Unpacking and inspecting the blade
z Environmental and power requirements
z Precautions during the operation
z Checking the installation environment
z Installing accessories
z Installation and removal procedures
z Ejector handles
3.2 Unpacking and Inspecting the Blade
Shipment Inspection
To inspect the shipment, perform the following steps.
1. Verify that you have received all items of your shipment:
Printed "Getting Started" guide
ATCA-7150 blade
Any optional items ordered
2. Check for damage and report any damage or differences to the customer service.
Damage of Circuits
Electrostatic discharge and incorrect installation and removal of the blade can damage
circuits or shorten their life.
Before touching the blade or electronic components, make sure that you are working in an
ESD-safe environment.