Extron electronic IPL T SF Series Switch User Manual


 
IPL T SF Series Interfaces • Software Setup
3-25
5. Click Done. The dialog box closes.
Building and Uploading a GC File
Before a Global Conguration (GC) le is active in the
GlobalViewer interface, the GC le must be “built” and
“uploaded” to a GlobalViewer host device.
The “build” process compiles all of the conguration data you
have entered into the GC le for each A/V network device.
The “upload” process delivers the built (compiled) le to the
GlobalViewer host device.
After the GC le has been uploaded to a host device, you can
launch the GlobalViewer interface by entering the host device’s
IP address in the Address eld of an Internet browser.
Step thirteen: build the Global Configurator file
There are two Build commands:
Build All Configurations — compiles conguration data for all
devices in the GC le, including data for devices previously
uploaded to a GlobalViewer host device.
Build Changed Configurations — compiles conguration data
only for devices that have been added or changed since the
previous build cycle.