Fujitsu 4Gbit/s FC I/O Modules Network Router User Manual


 
2 Installing the 4Gbit/s FC I/O Module 49
E
2
Installing the 4Gbit/s FC I/O
Module
This chapter explains the installation procedure in the server blade.
WARN ING
CAUTION
2.1 Installing in a Server Blade
Installing a FC Network Blade on chassis network blade slot 3 or network blade slot 4 is
necessary in order to connect this product to the external FC-SW (device) or storage
device.
When installing or removing this product, make sure to remove the server blade
from the chassis. Failure to do so may cause electric shock.
For details on how to remove the server blade from the chassis, refer to "Blade
Server System Unit Hardware Guide".
The circuit boards and soldered parts of internal options are exposed. They can
be damaged by static electricity. Before handling them, first touch a metal part of
the server to discharge static electricity from your body.
Do not touch the circuitry on boards or soldered parts. Hold the metallic areas or
the edges of the circuit boards.
These products are susceptible to static electricity. Place them on conductive
pads or keep them in their packaging as long as they are not necessary.
When installing a server blade in the BX600 S2 chassis, this product cannot be
installed in the server blade.