RX900 S1 Maintenance Manual 269
Baseboard
14.3.4 Completing the task
Ê Perform the following procedures to complete the task:
1. "Inserting the UFM" on page 265
2. When expansion cards have been removed to access the installation
place: Install the expansion cards, see "Expansion cards and BBU" on
page 105
3. "Installing the rear cover" on page 48
4. "Mounting the server in the rack" on page 49
5. "Bringing the server back to operation" on page 51
6. "Closing the rack door" on page 51