HP (Hewlett-Packard) 2610 Power Supply User Manual


 
2-1
Installing the Switch
2
Installing the Switch
The ProCurve 2610 Switches come with an accessory kit that includes the
brackets for mounting the switch in a standard 19-inch telco rack, in an
equipment cabinet, or on a wall. The brackets are designed to allow mounting
the switch in a variety of locations and orientations. Rubber feet are provided
that can be attached so the switch can be securely located on a horizontal
surface.
This chapter shows how to install the Switch 2610.
Included Parts
The 2610 Switches have the following components:
HP ProCurve Switch Quick Setup Sheet
Read Me First
HP ProCurve Switches General Safety and Regulatory Information
booklet
2610 Switch Specific Safety and Regulatory Information sheet
Console cable
Customer Support/Warranty booklet
Accessory kits:
2610 Non-PWR switches and the
J9086A 24/12-port partial PoE
switch
2610-PWR switches, J9087A
and J9089A
Kit number 5069-6535
Contains:
two mounting brackets
eight 8-mm M4 screws to attach the
mounting brackets to the switch
four 5/8-inch number 12-24 screws to
attach the switch to a rack
four rubber feet
Kit number 5069-5705
Contains:
two mounting brackets
1
eight 8-mm M4 screws to attach the
mounting brackets to the switch
four 5/8-inch number 12-24 screws to
attach the switch to a rack
four rubber feet
1
The mounting brackets in this kit are longer to support the increased depth of the 2610-
PWR products.