HP (Hewlett-Packard) ML330 G6 Server User Manual


 
Hardware options installation 57
Be sure to thread the cables through the rear of the non-hot-plug expansion cage into the server.
9. Connect the cables to the SATA connectors 1-4 on the system board ("System board components" on
page 11).
10. Install the air baffle.
11. Install the access panel (on page 22).
12. Do one of the following:
o Close or install the tower bezel, as needed.
o Slide the server back into the rack.
13. Power up the server (on page 20).
Removable media devices
This section provides the following information and procedures:
Identifying guide screws (on page 58)
SATA optical drive option (on page 58)
USB tape drive option (on page 60)
Full-height tape drive option (on page 62)