HP (Hewlett-Packard) ML330 G6 Server User Manual


 
Hardware options installation 71
7. Connect the cable to the cache module.
8. Install the battery pack.
9. Route the cable.
10. Install the access panel (on page 22).
11. Do one of the following:
o Close or install the tower bezel, as needed.
o Slide the server back into the rack.
12. Power up the server (on page 20).
FBWC module and capacitor pack option
CAUTION: Do not use this controller with cache modules designed for other controller models,
because the controller can malfunction and you can lose data. Also, do not transfer this cache
module to a different controller module, because you can lose data.