Honeywell 99EXLWX-XXXXXXXI Laptop User Manual


 
15 - 8
5. Slide the base onto the DIN Rail using the slot on the bottom of the base.
Channel Bracket Installation (Pre-existing Hardware Installations)
When choosing a location and installing the optional channel bracket:
Do not exceed 150 lbs. maximum load on the channel bracket.
Leave a minimum of 16 in. (40.64 cm) of horizontal space between the hardware used to attach the
channel bracket to the wall.
An electrical outlet must be easily accessible.
The mounting location should be dry, stable, easily accessible, and well lighted.
Tools Required
•Drill
7/8 in. Drill Bit (for hollow wall installations) or 1/4 in. Drill Bit (for wood stud installations)
#2 Phillips Screw Driver
Medium Flat Head Screw Driver
9/16 in.Socket Wrench
Hardware Required
3/8 in.-16 spring nut, for 13/16 in. deep strut, Qty. 4 per wall bracket
3/8 in. flat washer, Qty. 4 per wall bracket
3/8 in.-16 x 1.00 in., cap screw, grade 5, Qty. 4 per wall bracket
Hollow Wall Installations:
3/8 in. x 4 in. round head toggle bolt, 2-5/8 in. usable length, Qty. 4
3/8 in. flat washer, Qty. 4
Wood Stud Installations:
3/8 in. x 2 1/2 in. length hex head lag screw, Qty. 4
3/8 in. fat washer, Qty. 4
Wall Bracket
Wall Bracket
DIN Rail