IBM HPSS Network Card User Manual


 
6.3.11. Pre-Conversion System Check
It is strongly recommended that a test conversion be performed prior to running the
conversion on a production system. See Section 184: Testing the Metadata Conversion
on page 184
Ensure that the DB2 database has been configured prior to the conversion
Conversion output should be captured and any problems corrected before continuing. See
Section 6.2.7: Capturing the Metadata Conversion Output on page 185 for information
on capturing and viewing the conversion output
See Section 6.2.6: Estimating the Metadata Conversion Time on page 184 to estimate the running
time for the HPSS 4.5 conversion utilities. See Section 5.7: Tune DB2 on page 171 for DB2 Tuning
needed prior to performing the conversions (for 4.5 upgrades only).
HPSS Installation Guide July 2008
Release 6.2 (Revision 2.0) 202