Promise Technology EX4650A Computer Hardware User Manual


 
Chapter 5: Management with WebPAM PRO
111
Also see “Predictive Data Migration (PDM)” on page 184.
To run PDM:
1. In Tree View, click the Subsystem icon.
2. From the dropdown menu on the Background Activities tab, choose Start
PDM.
3. In the next screen, choose the Source and Target physical drives.
The suspect physical drive is the Source. The replacement physical drive is
the Target.
4. Click the Start button.
Viewing Scheduled Activities
To view scheduled activities for this subsystem:
1. Click the Subsystem icon Tree View.
2. Click the Scheduler tab in Management View.
Scheduling an Activity
To set a scheduled activity for this subsystem:
1. Click the Subsystem icon Tree View.
2. From the dropdown menu on the Scheduler tab, choose Add BGA
Scheduler.
3. Click the option button of the activity you want:
Media Patrol. See “Running Media Patrol” on page 110
Redundancy Check. See “Running Redundancy Check” on page 147
Spare Check. See “Running Spare Check” on page 152
4. In the Scheduler dialog box, check the Enable This Schedule box.