Agilent Technologies G6600-90006 Computer Accessories User Manual


 
12 Operation and Maintenance Manual
3 Installation
Overview 40
Step 1: Selecting a Location 41
Power Requirements 41
Figure 10. Drawing of the Detector with Dual Plasma Burner and Controller 42
Environmental Considerations 42
Combustion Gas Requirements 42
Step 2: Unpack and Inspect the Instrument 45
Required Installation Tools 45
Step 3: Set Up the Vacuum Pump 46
Installing the Edwards RV5 Pump Oil-Sealed Vacuum Pump 46
Figure 11. RV5 Oil-Sealed Vacuum Pump and Associated Traps (Front Side) 49
Figure 12. RV5 Oil-Sealed Vacuum Pump and Associated Traps (Back Side) 49
Figure 13. RV5 Oil- Sealed Vacuum Pump and Associated Traps (Top) 50
Figure 14. RV-5 Oil-S ealed Vacuum Pump Exhaust Line 51
Installing the Welch Dry Piston Vacuum Pump 52
Figure 15. The Welch Dry Piston Pump 54
Figure 16. Oil Drain Kit with Ballast Control 54
Step 4: Connect the Power Cord 56
Figure 17. SCD Rear Panel Diagram 56
Step 5: Install the Dry Compressed Air or O
2
Supply 57
Step 6: Install the Signal Output Cables 58
Standard Cable Connection 58
HP 3390 Series Integrator Cable Connection 58
HP 3396 Integrator Cable Connection 58
HP 5890 GC Analog Input Board 58
Agilent 6890 GC Analog Input Board 58
Step 7: Install the Dual Plasma Burner 59
Figure 18. Dimensions of GC Liner Cut-Outs 59
Step 8: Install the Dual Plasma Controller 60
Figure 19. Dual Plasma Controller Rear Panel 60
Step 9: Install Column Connections 61
Capillary Columns 61
Figure 20. Measuring Column Insertion 61