q 10. Place the Symmetra
TM
into Bypass by following the
screen sequence in figure 5-23.
Fig 5-23 Initiate a Self-Test Sequence
The Bypass LED should light, and the PowerView display will
indicate that the Symmetra
TM
is bypassed.
q 11. Return the Symmetra
TM
to the on-line mode of opera-
tion by following the screen sequence in figure 5-24.
Fig 5-24 Return to On-Line Sequence
The Bypass LED should go out, and the message “UPS IS OUT
OF BYPASS” will appear on the PowerView display. Press any
key to return to the startup screen.
q 12. Power down the load equipment by following the
screen sequence in figure 5-25.
Fig 5-25 Power Down the Load Sequence
From the Control menu, power down the load equipment by
executing the UPS LOAD OFF command. After several sec-
onds, the “UPS LOAD IS OFF” message is displayed. All LEDs
on the PowerView should be off.
q 13. Power down the Symmetra
TM
by switching the system
enable switch and the input circuit breaker to the “off” posi-
tion. The installation procedure has now been completed.
Chapter 5 - System Setup