Because the installation process begins on
the loading dock, this chapter provides the
procedures for inspecting the Symmetra
TM
Power Array frame and modular components
when they arrive. It includes procedures for
moving the frame to the installation site,
removing it from the pallet, and preparing the
frame and the modules for installation.
Chapter Three
Unpacking and Installing Frame