American Power Conversion SYMINIF-PD Power Supply User Manual


 
Setup of Power Array
After the wiring connections have been installed and checked
by the electrican, the Power Array is ready for the installation
of the battery and power modules. After they are installed, the
louvered cover grills are replaced onto the frame, and the
PowerView user interface is mounted on the frame.
Frame Leveling Procedure
Position the Power Array so there will be adequate airflow
clearance in the front and the rear of the frame. See figure 2-1
in chapter 2. The weight of the Power Array is supported by
four 1.5” leveling feet pads. Four metal plates can be placed
under each of the leveling feet pads to help displace the weight
of the Power Array.
The procedure for leveling the frame is as follows:
1. Hand turn all four leveling feet until the pads make contact
with the floor.
2. Use an open-end wrench to extend each of the leveling feet,
by turning the hex nut three complete revolutions.
3. Using a torpedo level, adjust the leveling feet until the frame
is level.
Removing Cover Grills
The louvered cover grills must be removed before the power
and battery modules can be installed. The procedure for re-
moving the cover grills is as follows:
Note: Handle covers with care to prevent scratching them.
1. Grasp one of the cover grills by the the side holds that are
molded into it. See figure 5-1.
2. Pull the cover straight forward.
3. Cover will unsnap from frame.
4. Remove all cover grills in this manner, and place them to
one side.
Fig 5-1 Removing Cover Grills from Frame
Chapter 5 - System Setup
5-1