APC AP9254 Switch User Manual


 
POWER
100-240V~, .1a, 50/80Hz
P
T 2A, 250 VAC
4. Locate the power cords that came with your APC KVM Switch units.
Plug each one into the IEC power connectors on the switch units.
Make sure that the power switches are off, then plug the other end
of the power cords into appropriate AC wall outlets. This outlet must
be near the equipment and easily accessible to allow for unplug-
ging prior to any servicing of the unit.
5. Power-up your slave switch first followed by your master switch,
then all attached computers.
The APC KVM Switch and all attached computers should be
powered down before servicing the unit. Always disconnect the
power cord from the wall socket.
Adding New Channels with Paired Units
1. Select “Add Channel’’ from the Channel Maintenence Menu. Type
in a new channel name, up to 14 characters long, and press Enter.
2. At the next prompt, type in the letter “1” if the server is attached to
the master unit or “2” if it is attached to the slave unit. Press Enter.
3. When prompted for another cascade level, type Y and press Enter.
4. Type the number that corresponds to the computer port that the com-
puter is attached to on the APC KVM Switch and press Enter.
5. Type N when prompted for another cascade level and press Enter.
Press Esc at any point to exit this operation without adding a channel.
Note: Keyboard switching is not available on paired units. All other
keyboard controls function as described earlier in the manual.
31