Cabletron Systems SEHI-22FL Switch User Manual


 
Chapter 5: Connecting to the Network
5-6 SEHI User’s Guide
Connect a fiber optic link segment to an EPIM-F1, EPIM-F2, or an
EPIM-F3 as follows:
1. Remove the protective plastic covers from the fiber optic ports on the
applicable port on the module and from the ends of the connectors on
each fiber strand.
2. Attach the fiber labeled 1 to the applicable RX port on the module. See
Figure 5-3.
3. Attach the fiber labeled 2 to the applicable TX port on the module.
4. At the other end of the fiber optic cable, attach the fiber labeled 1 to
the transmit port of the device.
5. Attach the fiber labeled 2 to the receive port.
6. Check that the EPIM LNK LED is on. If the LED is off, perform the
following steps until it is on:
a. Check that the power is on for the device at the end of the link.
b. Verify that the fiber strands are properly crossed over between the
applicable port on the module and the fiber optic device at the
other end of the fiber optic link segment.
c. Verify that the fiber connection meets the dB loss specifications
outlined in fiber optic network requirements.
If a link is not established, contact Cabletron Systems Technical Support.
SEHI Book Page 6 Friday, April 19, 1996 10:46 AM