125
Chapter 11 Data Communication
4. Use an optional SB-90 9-9 pin connector to connect the PV Unit cable
to the BN Unit Mini Cradle.
• All data communication settings must be made on the PV Unit, which is
the host unit. The BN Unit is the terminal unit.
To send data from the PV Unit to the BN Unit
1. After connecting the two units, turn on the PV Unit.
• BN Unit power should still be off at this time.
2. Display the list view in a mode whose data can be sent with this setup.
• This configuration supports transfer of Contacts (Business, Personal),
Memo, Schedule, To Do, and Reminder data.
• Calendar and Expense Manager data cannot be transferred.
• Contacts Untitled 1-5 data is transferred as Personal data.
• Memo Untitled 1-5 data is transferred as Memo data (no category).
3. Tap Menu Bar to display the menu bar, and then tap System – Data
communication.
Host unit (PV Unit) Terminal unit (BN Unit)
Mini Cradle
START button
SB-90 9-9 pin connector