100 Chapter 5
Planning for Installation and Operation
G
2.4”
2.4”
G
11.8”
5.9”
Front
Floor cutout area for cables
Caster
Screw jack
Service clearance
26.8”
4.5”
4.5”
22.4”
5.9”
23.6”
(Unit: inches)
31.5”
7.9”
20.9”
94.5”
8.9”
18.1”2.8”
5.9”
2.8”
2.8”
31.5”
31.5”
G
Grid panel (perforated tile) (over 17.7”
×
17.7”)
8.9”
Figure 5.17 9960 Disk Array Unit Service Clearance and Cutout (inches)